Planning CCS Development in the West Mediterranean

D. Boavida, J. Carneiro, R. Martinez, M.A. van den Broek, Andrea Ramirez, A. Rimi, G. Tosato, M. Gastine

Research output: Contribution to journalArticleAcademic

Abstract

Transport and storage of CO2 are the elements in the CCS chain with the lowest cost, but they may well prove to be the elements defining the timeline for CCS development. The EU FP7 COMET project aimed to pave the road towards CCS development in the West Mediterranean (Portugal, Spain and Morocco). This paper provides the main highlights of the work conducted within COMET. The project addressed the temporal and spatial aspects of the development of the energy sector and other industrial activities in relation with CCS and its participation to CO2 emission reduction taking into account location, capacity and availability of CO2 sources and of potential CO2 storage formations. Special attention was given to a balanced optimization on transport modes, matching the sources and sinks, meeting optimal cost - benefit trade-offs, for a CCS network infrastructure as part of an international cooperation policy.
Original languageEnglish
Pages (from-to)3212-3220
Number of pages9
JournalEnergy Procedia
Volume37
DOIs
Publication statusPublished - 2013
EventGHGT-11 - Kyoto, Japan
Duration: 1 Jan 2013 → …

Keywords

  • CO2 Transport
  • Portugal
  • Spain
  • Morocco

Fingerprint

Dive into the research topics of 'Planning CCS Development in the West Mediterranean'. Together they form a unique fingerprint.

Cite this