TY - BOOK
T1 - Performance evaluation of the 1 MW building integrated PV project in Nieuwland, Amersfoort, the Netherlands, January 2001 – February 2006
AU - de Keizer, A.C.
AU - ter Horst, E.
AU - van Sark, W.G.J.H.M.
N1 - Project: PV-UP-SCALE
PY - 2008
Y1 - 2008
N2 - The performance of 463 decentralised PV systems with a total installed peak power of
1.2 MWp, has been evaluated for a period of five years (2001-2006). The systems are
situated in the urban area Nieuwland in the town of Amersfoort in the Netherlands
and are part of one of the largest decentralised PV projects in the world. The
evaluated systems are situated in eight sections and are characterized by different
architectural designs, tilt and azimuth angles. In six of the sections the majority of the
systems perform well. Data indicate that in those cases there is no substantial
lowering of the performance during 5 years. However, several individual systems in
those sectors do not perform well. Often defects in the PV system or changes in the
roof construction are the cause. For example, string errors are not recognized as such
and as a consequence not repaired. In two other sections the performance of the
systems is insufficient, but no clear explanation could be found.
AB - The performance of 463 decentralised PV systems with a total installed peak power of
1.2 MWp, has been evaluated for a period of five years (2001-2006). The systems are
situated in the urban area Nieuwland in the town of Amersfoort in the Netherlands
and are part of one of the largest decentralised PV projects in the world. The
evaluated systems are situated in eight sections and are characterized by different
architectural designs, tilt and azimuth angles. In six of the sections the majority of the
systems perform well. Data indicate that in those cases there is no substantial
lowering of the performance during 5 years. However, several individual systems in
those sectors do not perform well. Often defects in the PV system or changes in the
roof construction are the cause. For example, string errors are not recognized as such
and as a consequence not repaired. In two other sections the performance of the
systems is insufficient, but no clear explanation could be found.
M3 - Report
BT - Performance evaluation of the 1 MW building integrated PV project in Nieuwland, Amersfoort, the Netherlands, January 2001 – February 2006
PB - Copernicus Institute, Utrecht University
CY - Utrecht
ER -