Abstract
In the version of ‘Supplementary Data 1’ originally published with this Article, the units for the ‘Capacity|Electricity|*’ variables in the ‘Non_Investment_Annual’ tab were incorrectly given as EJ/yr; they should have read GW. This has now been corrected. Also, some of the variables listed in the ‘Non_Investment_Variable_Defs’ were not required and have therefore been removed.
Original language | English |
---|---|
Pages (from-to) | 699 |
Number of pages | 1 |
Journal | Nature Energy |
Volume | 2018 |
Issue number | 3 |
DOIs | |
Publication status | Published - 2 Jul 2018 |